The SGW 102 Polymer Cement Waterproof Coating is a two-component water-based waterproof coating made, using a scientific formula, from an organic liquid mixture of high-quality modified acrylic copolymer emulsion and multiple imported additives and an inorganic powder mixture of composite portland cement and various additives.
Executive Standard
The product complies with the requirements of GB/T23445-2009 Polymer-modified Cement Compounds for Waterproofing Membrane.
Product Characteristics
1. Green, safe and environment friendly
2. Applicable to wet and damp substrates and firm bonding
3. Roller or brush coating
4. Air permeable but waterproof
5. High film strength and big extension
Method of Application
1. When the coating film of the waterproof layer is 1.0 mm thick, the usage is about 1.7 ~ 1.9 kg/m2. (Actual usage depends on the substrate condition and coating thickness.)
2. The coating film thickness of the waterproof layer shall not be less than 1.5mm, and the thickness of the vertical plane shall not be less than 1.2mm.
3. The product mix ratio is liquid: powder = 1:1.5 (mass ratio).
4. Substrate treatment → additional waterproof layer in details → coating for large-area waterproof layer → quality inspection and acceptance → application of protective and isolation layers
5. The normal application temperature is 5 ℃ ~ 35 ℃. Application is not allowed in rainy weather.
6. Substrate treatment: The substrate should be flat, solid, clean, and free of visible water, ash and oil stains. Internal and external corners and tube roots should be subject to arc treatment.
7. Coating ratio: Refer to the product certificate for the mixture ratio. First, add the liquid material into a mixing bucket. Then, slowly add the powder material in the process of mechanical mixing, and mix evenly. The prepared coating should be used up within 2 hours. It is forbidden to add water again in the use process.
8. Additional waterproof layer in details: An additional layer should be made for internal and external corners, pipe roots, drainage outlets and other detail nodes, which are to be coated 2-3 times, and matrix reinforcement material shall be sandwiched to make the waterproof coating fully permeate the matrix layer, without wrinkle and edge warping.
9. Coating for large-area waterproof layer: For large waterproof layers, it is proper to coat the facade first and then the planes, with 2-3 courses of coating applied. However, the next course can only start after the previous coating is dry, and the direction of coating should be vertical to that of the preceding coating.
10. Application of protective and isolation layers: In a humid environment, the drying of the product will become slow, and the drying time should be appropriately extended. After the waterproof layer is completely dried, the closed water test should be carried out. After acceptance inspection, the protective and isolation layers should be applied according to the design requirements.
Media Contact
Company Name: SKSHU Paint Co., Ltd.
Email: Send Email
Phone: +86 0594 2761989
Address:Headquarter: 518 Liyuan North Avenue, Licheng District
City: Putian
State: Fujian, 351100
Country: China
Website: https://www.3treesgroup.com/en/